{"id":6400,"date":"2015-10-15T11:07:34","date_gmt":"2015-10-15T11:07:34","guid":{"rendered":"https:\/\/aistec.com\/tunel-alcazaba\/"},"modified":"2025-02-05T16:17:47","modified_gmt":"2025-02-05T16:17:47","slug":"tunel-alcazaba","status":"publish","type":"post","link":"https:\/\/aistec.com\/en\/tunel-alcazaba\/","title":{"rendered":"Aistec starts the study on the Alcazaba Tunnel"},"content":{"rendered":"<p>The acoustic conditioning company Aistec is currently conducting an acoustic study of the Alcazaba Tunnel in M\u00e1laga to assess the impact of noise in one of the most important access points to the city center and propose the necessary measures for improvement.<br \/>This study is being carried out within the framework of the collaboration agreement between the specialized acoustic solutions company and the M\u00e1laga City Council. Since the approval of M\u00e1laga\u2019s Noise Action Plans in 2009\u2014in compliance with the Noise Law\u2014the council has progressively increased the necessary measures in this regard, particularly those related to road traffic, which is the main source of noise in the city.<br \/>In this context, the Alcazaba Tunnel is an area of great interest, as it registers extremely high noise levels, ranging between 85 and 90 decibels (dBA). The acoustic conditioning of the tunnel has been a recurring demand addressed on multiple occasions by the city&#8217;s Social Council. For this reason, Aistec will conduct a study on acoustic conditioning measures to determine the type of interventions needed to reduce noise levels.<br \/>&#8220;Currently, the noise levels in the tunnel are excessively high, and combined with the duration of pedestrian exposure to these levels, this exposure becomes both disturbing and harmful to citizens,&#8221; says Antonio Jim\u00e9nez, Aistec\u2019s manager. He adds, &#8220;The ultimate goal of this initiative is to carry out measurements of reverberation time and sound pressure levels to determine which type of intervention and materials are best suited to achieve a significant improvement in acoustic comfort inside the emblematic Alcazaba Tunnel in M\u00e1laga. At Aistec, we will offer solutions that ensure proper comfort and minimal sound pressure levels while acting in the least intrusive manner possible.&#8221;<\/p>\n<p><strong>See news in the media: <\/strong><\/p>\n<p><a href=\"http:\/\/www.diariosur.es\/malaga-capital\/201510\/13\/arranca-estudio-acustico-tunel-20151013140118.html\">Diario Sur<\/a><\/p>\n<p><a href=\"http:\/\/www.laopiniondemalaga.es\/malaga\/2015\/10\/14\/aistec-comienza-estudiar-impacto-acustico\/801721.html\">La Opini\u00f3n de M\u00e1laga<\/a><\/p>\n<p><a href=\"http:\/\/www.101tv.es\/news\/el-ruido-una-de-las-pesadillas-de-los-malaguenos-101-television-malaga.aspx\">101tv.es<\/a><\/p>\n<p><a href=\"http:\/\/www.europapress.es\/andalucia\/malaga-00356\/noticia-comienza-estudio-acustico-tunel-alcazaba-niveles-ruido-muy-elevados-20151013160042.html\">Europa Press<\/a><\/p>\n<p><a href=\"http:\/\/www.20minutos.es\/noticia\/2578481\/0\/comienza-estudio-acustico-tunel-alcazaba-que-presenta-niveles-ruido-hasta-90-decibelios\/\">20 minutos<\/a><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-4057 size-medium\" title=\"T\u00fanel Alcazaba\" src=\"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba-300x201.jpg\" alt=\"T\u00fanel Alcazaba\" width=\"300\" height=\"201\" srcset=\"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba-300x201.jpg 300w, https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba-768x516.jpg 768w, https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba.jpg 934w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><strong>Aistec, more than 15 years of experience<a href=\"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba.jpg\"><br \/>\n<\/a><\/strong><\/p>\n<p>Aistec is a leading company in the field of acoustic insulation and conditioning in Malaga. With more than 15 years of experience and offices in Malaga, Madrid and Barcelona, Aistec has undertaken acoustic conditioning projects in Malaga, among others, in the Palacio de la Aduana, the Carlos Haya University Hospital or the Sala Unicaja de Conciertos Mar\u00eda Cristina. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The acoustic conditioning company Aistec is currently conducting an acoustic study of the Alcazaba Tunnel in M\u00e1laga to assess the impact of noise in one of the most important access points to the city center and propose the necessary measures for improvement.This study is being carried out within the framework of the collaboration agreement between [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":6401,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[164],"tags":[],"class_list":["post-6400","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualidad-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Aistec begins the acoustic study of the Alcazaba Tunnel<\/title>\n<meta name=\"description\" content=\"The acoustic engineering firm Aistec starts the acoustic conditioning study of the Alcazaba Tunnel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aistec.com\/en\/tunel-alcazaba\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Aistec begins the acoustic study of the Alcazaba Tunnel\" \/>\n<meta property=\"og:description\" content=\"The acoustic engineering firm Aistec starts the acoustic conditioning study of the Alcazaba Tunnel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aistec.com\/en\/tunel-alcazaba\/\" \/>\n<meta property=\"og:site_name\" content=\"aistec\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AistecCreatingComfort\" \/>\n<meta property=\"article:published_time\" content=\"2015-10-15T11:07:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-05T16:17:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"934\" \/>\n\t<meta property=\"og:image:height\" content=\"627\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"marketing\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"marketing\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/\"},\"author\":{\"name\":\"marketing\",\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#\\\/schema\\\/person\\\/ed52ec71bc10c926bd414587fd688fe2\"},\"headline\":\"Aistec starts the study on the Alcazaba Tunnel\",\"datePublished\":\"2015-10-15T11:07:34+00:00\",\"dateModified\":\"2025-02-05T16:17:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/\"},\"wordCount\":377,\"publisher\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/aistec.com\\\/wp-content\\\/uploads\\\/2015\\\/10\\\/Tunel_Alcazaba.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"ItemPage\"],\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/\",\"url\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/\",\"name\":\"Aistec begins the acoustic study of the Alcazaba Tunnel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/aistec.com\\\/wp-content\\\/uploads\\\/2015\\\/10\\\/Tunel_Alcazaba.jpg\",\"datePublished\":\"2015-10-15T11:07:34+00:00\",\"dateModified\":\"2025-02-05T16:17:47+00:00\",\"description\":\"The acoustic engineering firm Aistec starts the acoustic conditioning study of the Alcazaba Tunnel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/#primaryimage\",\"url\":\"https:\\\/\\\/aistec.com\\\/wp-content\\\/uploads\\\/2015\\\/10\\\/Tunel_Alcazaba.jpg\",\"contentUrl\":\"https:\\\/\\\/aistec.com\\\/wp-content\\\/uploads\\\/2015\\\/10\\\/Tunel_Alcazaba.jpg\",\"width\":934,\"height\":627},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/tunel-alcazaba\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/aistec.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Aistec starts the study on the Alcazaba Tunnel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/aistec.com\\\/en\\\/\",\"name\":\"aistec\",\"description\":\"Paneles ac\u00fasticos\",\"publisher\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/aistec.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#organization\",\"name\":\"AISTEC AISLAMIENTOS SLU\",\"url\":\"https:\\\/\\\/aistec.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/aistec.com\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/logo-aistec.png\",\"contentUrl\":\"https:\\\/\\\/aistec.com\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/logo-aistec.png\",\"width\":249,\"height\":70,\"caption\":\"AISTEC AISLAMIENTOS SLU\"},\"image\":{\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AistecCreatingComfort\",\"https:\\\/\\\/www.instagram.com\\\/aistec_\\\/?hl=es\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/aistec-creating-comfort\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/aistec.com\\\/en\\\/#\\\/schema\\\/person\\\/ed52ec71bc10c926bd414587fd688fe2\",\"name\":\"marketing\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb6d4365738a3d2a5db4ad282cfdcb04e962362e40828ef855f2b251596aa534?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb6d4365738a3d2a5db4ad282cfdcb04e962362e40828ef855f2b251596aa534?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb6d4365738a3d2a5db4ad282cfdcb04e962362e40828ef855f2b251596aa534?s=96&d=mm&r=g\",\"caption\":\"marketing\"},\"url\":\"https:\\\/\\\/aistec.com\\\/en\\\/author\\\/marketing\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Aistec begins the acoustic study of the Alcazaba Tunnel","description":"The acoustic engineering firm Aistec starts the acoustic conditioning study of the Alcazaba Tunnel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aistec.com\/en\/tunel-alcazaba\/","og_locale":"en_US","og_type":"article","og_title":"Aistec begins the acoustic study of the Alcazaba Tunnel","og_description":"The acoustic engineering firm Aistec starts the acoustic conditioning study of the Alcazaba Tunnel.","og_url":"https:\/\/aistec.com\/en\/tunel-alcazaba\/","og_site_name":"aistec","article_publisher":"https:\/\/www.facebook.com\/AistecCreatingComfort","article_published_time":"2015-10-15T11:07:34+00:00","article_modified_time":"2025-02-05T16:17:47+00:00","og_image":[{"width":934,"height":627,"url":"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba.jpg","type":"image\/jpeg"}],"author":"marketing","twitter_card":"summary_large_image","twitter_misc":{"Written by":"marketing","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/#article","isPartOf":{"@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/"},"author":{"name":"marketing","@id":"https:\/\/aistec.com\/en\/#\/schema\/person\/ed52ec71bc10c926bd414587fd688fe2"},"headline":"Aistec starts the study on the Alcazaba Tunnel","datePublished":"2015-10-15T11:07:34+00:00","dateModified":"2025-02-05T16:17:47+00:00","mainEntityOfPage":{"@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/"},"wordCount":377,"publisher":{"@id":"https:\/\/aistec.com\/en\/#organization"},"image":{"@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/#primaryimage"},"thumbnailUrl":"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":["WebPage","ItemPage"],"@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/","url":"https:\/\/aistec.com\/en\/tunel-alcazaba\/","name":"Aistec begins the acoustic study of the Alcazaba Tunnel","isPartOf":{"@id":"https:\/\/aistec.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/#primaryimage"},"image":{"@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/#primaryimage"},"thumbnailUrl":"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba.jpg","datePublished":"2015-10-15T11:07:34+00:00","dateModified":"2025-02-05T16:17:47+00:00","description":"The acoustic engineering firm Aistec starts the acoustic conditioning study of the Alcazaba Tunnel.","breadcrumb":{"@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aistec.com\/en\/tunel-alcazaba\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/#primaryimage","url":"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba.jpg","contentUrl":"https:\/\/aistec.com\/wp-content\/uploads\/2015\/10\/Tunel_Alcazaba.jpg","width":934,"height":627},{"@type":"BreadcrumbList","@id":"https:\/\/aistec.com\/en\/tunel-alcazaba\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/aistec.com\/en\/"},{"@type":"ListItem","position":2,"name":"Aistec starts the study on the Alcazaba Tunnel"}]},{"@type":"WebSite","@id":"https:\/\/aistec.com\/en\/#website","url":"https:\/\/aistec.com\/en\/","name":"aistec","description":"Paneles ac\u00fasticos","publisher":{"@id":"https:\/\/aistec.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aistec.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/aistec.com\/en\/#organization","name":"AISTEC AISLAMIENTOS SLU","url":"https:\/\/aistec.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aistec.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/aistec.com\/wp-content\/uploads\/2022\/09\/logo-aistec.png","contentUrl":"https:\/\/aistec.com\/wp-content\/uploads\/2022\/09\/logo-aistec.png","width":249,"height":70,"caption":"AISTEC AISLAMIENTOS SLU"},"image":{"@id":"https:\/\/aistec.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AistecCreatingComfort","https:\/\/www.instagram.com\/aistec_\/?hl=es","https:\/\/www.linkedin.com\/company\/aistec-creating-comfort\/"]},{"@type":"Person","@id":"https:\/\/aistec.com\/en\/#\/schema\/person\/ed52ec71bc10c926bd414587fd688fe2","name":"marketing","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fb6d4365738a3d2a5db4ad282cfdcb04e962362e40828ef855f2b251596aa534?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fb6d4365738a3d2a5db4ad282cfdcb04e962362e40828ef855f2b251596aa534?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fb6d4365738a3d2a5db4ad282cfdcb04e962362e40828ef855f2b251596aa534?s=96&d=mm&r=g","caption":"marketing"},"url":"https:\/\/aistec.com\/en\/author\/marketing\/"}]}},"_links":{"self":[{"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/posts\/6400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/comments?post=6400"}],"version-history":[{"count":1,"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/posts\/6400\/revisions"}],"predecessor-version":[{"id":11301,"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/posts\/6400\/revisions\/11301"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/media\/6401"}],"wp:attachment":[{"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/media?parent=6400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/categories?post=6400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aistec.com\/en\/wp-json\/wp\/v2\/tags?post=6400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}